PROJECT PROFILE

Client: Dynegy / SM

Location: Chula Vista, CA

Value: $12,100,000

Year: 2014-2015
Scope of Work: Specialized Industrial Services Inc. served as prime contractor for the demolition of all foundations and utility infrastructure from the former 700 MW capacity power plant. The power plant foundations and ocean cooling water piping was over 10 feet thick in some areas requiring extensive breaking with 16,000 ft-lb rated hydraulic breakers. SIS also performed the grading work at the site which involved reshaping the surface so the property would drain to existing storm drain system.


Safety Overview: Stormwater management and monitoring program implemented, Air and Noise monitoring program also required throughout this project.


OSHA Recordables: None